ANALISIS MULTI KRITERIA PENDANAAN PEMBANGUNAN JEMBATAN GANTUNG DENGAN ANGGARAN PENDAPATAN DAN BELANJA NEGARA (APBN)

  • Frias Rusinta UNIVERSITAS NAROTAMA SURABAYA
  • Julistyana Tistogondo Universitas Narotama
Keywords: AHP,regional infrastructure, suspension bridge, priority

Abstract

As a part of the Nawa Cita program of the President of the Republic of Indonesia, the suspension bridge construction program is building Indonesia from the periphery by strengthening regions and villages within the framework of the unitary state. The construction of suspension bridges is intended to assist local governments and communities in overcoming problems such as improving inter-village development, alleviating centralized regional development, cutting down limited access to inter-village transportation that has not been connected with education, health facilities, or other facilities, as infrastructure for disaster mitigation or evacuation, as well as development Inadequate infrastructure for isolated villages and outermost villages. Setting priorities for the proposals of construction of a suspension bridge for pedestrians need the criteria and judgments that will simplify the determination of the priority of the suspension bridge proposal. The criteria and judgment need to be substantiated scientifically, by applying Analytical Hierarchy Process (AHP) method in determining the priority of the proposals. From this study, we can interpret that the benefit of the bridge to economic activity has the biggest percentage 26.50% of the overall importance of the criteria and on the other hand, administrative requirements have the smallest percentage 6.34% of the overall importance of the criteria. Keywords:AHP,regional infrastructure, suspension bridge, priority.

References

Kementerian Pekerjaan Umum dan Perumahan Rakyat. 2015a. Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat Nomor 47/PRT/M/2015 Tentang Petunjuk Teknis Penggunaan Dana Alokasi Khusus Bidang Infrastruktur. Jakarta: Kementerian Pekerjaan Umum dan Perumahan Rakyat.
Kementerian Pekerjaan Umum dan Perumahan Rakyat. 2015b. Surat Menteri Pekerjaan Umum Dan Perumaham Rakyat Nomor JB.02.02 Mn/1287 Tanggal 21 Desember 2015 Perihal Jembatan Gantung Untuk Pejalan Kaki. Jakarta.
Pemerintah Indonesia. 2004. Undang-Undang Nomor 38 Tahun 2004 Tentang Jalan. Jakarta: Kementerian Pekerjaan Umum dan Perumahan Rakyat.
pu.go.id. 2017. “Bangun 32 Buah Jembatan Gantung, Kementerian PUPR Hadirkan Kemudahan Akses Bagi Masyarakat.” Retrieved March 16, 2021 (https://pu.go.id/berita/bangun-32-buah-jembatan-gantung-kementerian-pupr-hadirkan-kemudahan-akses-bagi-masyarakat).
Rahman, Abdul. 2008. “Penentuan Kriteria Yang Paling Berpengaruh Terhadap Prestasi Kerja Karyawan Di CV. Rimba Sentosa Sukoharjo.” Universitas Muhammadiyah Surakarta, Surakarta.
Rahmayanti, Reny. 2010. “Analisis Pemilihan Supplier Menggunakan Metode Analytical Hierarchy Process (AHP).” Universitas Sebelas Maret, Surakarta.
Saaty, Thomas L. 2008. Decision Making With The Analytic Hierarchy Process. Pittsburgh.
Sugiyono. 2009. Metode Penelitian Kuantitatif. Bandung: Alfabeta.
Published
2022-04-25
Abstract viewed = 6 times
PDF (Bahasa Indonesia) downloaded = 3 times